Before asking for an estimate
Build an address-specific request
- 1
Confirm the address
Start with the project address and distinguish cosmetic work from layout, structural, plumbing, electrical, gas, or mechanical changes before choosing a permit path.
- 2
Describe the proposed work
Separate finish-only updates from walls, layout, structural work, and every affected utility or trade.
- 3
Add useful evidence
Include current-condition photos and note known leaks, damage, access limits, existing plans, or prior permits.
- 4
Verify the official path
Check the current requirements with Los Angeles Department of Building and Safety (LADBS) before relying on timing or permit assumptions.